Chang Zheng 5 (Long March 5)

China’s new-generation heavy-lift orbital launcher, designed to loft space station modules, deep space probes, and heavy communications satellites into orbit.

cz-5-mlp



Programme

Like Russia and the Unite States, China used intercontinental ballistic missiles (ICBMs) as the launch vehicle for its early orbital launches. China’s first-generation orbital launch vehicles, including the CZ-2, 3 and 4 series, were all essentially derived from a single design—the Dong Feng-5 (DF-5) ICBM introduced in the early 1970s. Early versions of the Chang Zheng launch vehicles could place about 1.8 tonnes of payload into Low Earth Orbit (LEO). While their payload capacity has been incrementally increased, these launchers can not match the capability required to support China’s ambitious space station and deep space missions.

As a result, the Chinese space industry has been longing for a ‘large rocket’ that could provide sufficient payload capability to loft large spacecraft. The heavy-lift launch vehicle was a key aerospace system proposed under the 863 Programme, but it could only exist in concept as the Chinese space industry was unable to produce high-thrust rocket engines to power the launch vehicle. This finally changed in the 1990s when China acquired examples (and possibly design documents) of the Russian RD-120 liquid-fuel engine, which served as a template for China to develop its own new-generation engines.

Soon after 2000, the development for two major new series of rocket engines was approved by the Chinese government: the 120 t-thrust YF-100 high-pressure staged combustion cycle engine (including a smaller 18 t-thrust version YF-115) burning a LOX/Kerosene bi-propellant, and the 50 t-thrust YF-77 cryogenic engine burning the LOX/LH2 bi-propellant. In addition, a range of smaller upper-stages using both hypergolic and cryogenic propellants were also created.

As engine development proceeded, design work on the new-generation launcher family to be powered by these engines also proceeded in parallel. The original vision was ambitious: Chinese space engineers wanted to create three basic modular stages of 2.25 m, 3.35 m and 5.0 m diameter, powered by the YF-100 and YF-77 series engines. These modular stages can then be assembled into orbital launchers of various capabilities, all based on the common engine technology and rocket stage design. For example, the 3.35 m-diameter module powered by two YF-100 engines could serve as the strap-on booster for a heavy-lift launcher, but could also be used as the core vehicle for a medium-lift launcher.

However, this modular approach was eventually abandoned and instead three separate series of orbital launchers were developed: the 2.25 m-diameter (with a first-stage of 3.35 m diameter) small-load CZ-6, the 3.35 m-diameter medium-load CZ-7, and the 5 m-diameter heavy-lift CZ-5. Despite the abandoning of the modular approach, the three launcher series share common rocket engines with the YF-100, YF-115 and YF-77.

The development of the new-generation orbital launchers was not merely introduction of new launch vehicle designs, but also an overhaul of China’s aerospace manufacturing and orbital launch facilities. The payload capability of China’s existing generation launchers has reached a ceiling due to a single factor of logistics: as China’s three existing launch sites are all located inland, launcher components have to be transported from their factory to launch sites by railway. The size of the launcher is limited to 3.35 m in diameter and about 14 m in length. Any design bigger than these dimensions will not fit through the railway tunnels.

To overcome this limit, new rocket and spacecraft fabrication and test facilities have been constructed in Tianjin on the eastern coast of China mainland. At the same time, a brand new space launch centre with two launch complexes have been built at Wenchang, Hainan Island. Launcher components are transported from their manufacturing factory to the launch site by two specially-built Yuanwang sea-going cargo ships.


Back to top

CZ-5 Development

The CZ-5 development project gained governmental approval in June 2004, with the aim to introduce a heavy-load orbital launcher capable of lofting 14 tonnes of payload to Geostationary Transfer Orbit (GTO), or 25 tonnes to Low Earth Orbit (LEO). The development contract was awarded to China Academy of Launch Vehicle Technology (CALT), with Shanghai Academy of Spaceflight Technology (SAST) sharing some development tasks. The development featured a whole range of new technologies not seen on previous Chinese launcher designs, including new engines, digital flight control system, computer-aided 3D design methods, software model testing, and new welding techniques.

Both YF-100 and YF-77 have encountered great technical challenges, causing significant delays to the CZ-5 development. It took the Chinese space industry nearly two decades to fully digest the RD-120 technology and produce its own designs. In May 2012, the YF-100 engine was successfully tested at 7103 Factory of the Xi’an-based Academy of Aerospace Propulsion Technology (AAPT) to 20,000 revolutions per minute for 200 seconds, reaching a temperature of 3,000°C. This allowed the engine to be certified for design finalisation, making China the second country in the world after Russia to have grasped the high-pressure staged combustion cycle rocket engine technology.

The original CZ-5 design proposed six variants (A to E), using the 5 m diameter core stage and different combinations of strap-on boosters and an upper stage to achieve different payload capacities. However, only two variants have been developed: the basic variant two-stage CZ-5 designed for GTO missions, and the single-stage CZ-5B designed for LEO missions. Both variants are fitted with four strap-on boosters of 3.35 m diameter.

The first flight of the CZ-5 was originally scheduled for late 2014, but this date has slipped to November 2016. The CZ-5B will make its debut flight in 2017.


Back to top

CZ-5 Design

The basic variant CZ-5 is in a configuration of two-stage core vehicle (5 m diameter) plus four strap-on boosters (3.35 m diameter), giving a payload capacity of 14,000 kg to GTO. The launch vehicle is 56.97 m in length, with a gross mass of 869 t and lift-off thrust of 10,573 kN.


Back to top

CZ-5 Flight Sequence


Back to top

CZ-5 Mission History

Date           LV Serial     Centre        Payloads
------------------------------------------------------------
2016-11-03     CZ-5 (Y1)     Wenchang      YZ-2, Shijian 17

Back to top

CZ-5 First-Stage and YF-77 Engine

The first-stage of the CZ-5 is 31.02 m in length and 5 m in diameter, with a gross mass of 175.8 t. The stage comprises (from front to rear): oxidiser tank, inter-tank ring section, fuel tank, engine frame, and tail section. The front end of the forward oxidiser tank is protected by a fibreglass heat insulation layer to prevent damage from the high pressure and hot stream of engine exhaust from the second-stage engine during stage separation.

The stage is powered by two single-chamber YF-77 engine rated at 50 tonnes (510 kN) each at sea-level, or 70 tonnes (700 kN) in vacuum. Each engine can swing independently in two planes to provide directional thrust and steering for the launch vehicle. The two main engines are mounted on the engine frame secured to the rear of the fuel tank. The frame transfers the thrust of the engines to the vehicle’s thrust and weight bearing load structure.

The YF-77 is China’s first high-thrust cryogenic rocket engine, burning liquid hydrogen (LH2) as fuel and liquid oxygen (LOX) as oxidiser. Unlike some of the most advanced cryogenic rocket engines in the world, which all use staged combustion cycle, the YF-77 uses less efficient gas-generator cycle, resulting in an inferior performance compared with foreign designs of the same class.


Back to top

CZ-5 Strap-on Boosters and YF-100 Engine

The four strap-on boosters of the CZ-5 provide most of the initial thrust during during ascent. Each booster is 3.35 m in diameter and 26.28 m in length, and consists of oxidiser tank, inter-tank ring section, fuel tank, engine frame, and tail section. An aerodynamic nose is attached to the front end of the booster covering the upper bulkhead of the liquid oxygen tank.

Each booster is powered by two single-chamber YF-100 engines, producing a total thrust of 2,680 kN at sea-level. The engines can be pivoted at radial direction to provide additional directional thrust and steering for the launch vehicle. The two engines are mounted on the engine frame secured to the rear of the fuel tank. The frame transfers the thrust of the engines to the vehicle’s thrust and weight bearing load structure.

The YF-100 is a pump-fed staged combustion cycle liquid engine burning the LOX/kerosene bi-propellant, with adjustable thrust and variable mixture ratio. The engine’s pre-burner burns all the LOX mass flow with a low volume of kerosene to generate hot gas that powers the single turbine. The turbo-pump is a single-shaft design, with a single-stage oxygen pump and a dual-stage kerosene pump driven by the same turbine. It also has two low-pressure pumps that prevent cavitation. The engine has a heat exchanger to heat oxygen gas for LOX tank pressurisation, and also supplies high-pressure kerosene as hydraulic fluid for the thrust vector control actuators.


Back to top

CZ-5 Second-Stage and YF-75D Engine

The second-stage maintains the overall diameter of the first-stage at 5 m and comprises (from front to rear): instrument compartment, oxidiser tank, inter-tank ring section, and fuel tank. The engines are directly mounted on the rear of the fuel tank. The instrument compartment at the front houses the flight control system, navigation platform, and gas canisters.

The stage is powered by two single-chamber YF-75D engines, each rated at 78 kN in vacuum. The YF-75D was developed from the YF-75 liquid cryogenic rocket engine used by the CZ-3A series launchers, burning liquid hydrogen (LH2) as fuel and liquid oxygen (LOX) as oxidiser in a closed circuit expander cycle. Each engine can swing independently in two planes to provide directional thrust and steering. Both the combustion chamber and hydrogen turbine of the YF-75D have been redesigned to achieve better performance.


Back to top

YZ-2 Upper Stage

The YZ-2 (Yuan Zheng-2, “Expedition 2”) is a new upper stage specifically designed for use on the CZ-5. Developed by China Academy of Launch Vehicle Technology (CALT), the upper stage serves as a “space tug” to deliver spacecraft vehicles and satellites directly into their intended orbit without the need to use their own propulsion.

The upper stage is 5.2 m in diameter and weighs 1.8 t, with multiple re-ignitions and precision control capabilities. With its own propulsion, navigation and control systems, the YZ-2 upper stage is capable of flying a complex mission profile autonomously, performing a series of orbital manoeuvres to deploy its payloads at different altitudes and on different orbital planes.


Back to top

CZ-5 Payload Fairing

The payload fairing of the CZ-5 is 5.2 m in diameter and 12.5 m in length.


Back to top

CZ-5 Specifications

General features        CZ-5          CZ-5B
---------------------------------------------
Core stages.............2             1
Strap-on boosters.......4             4
Length..................56.97 m       53.70 m
Diameter................5 m           5 m
Mass, gross.............869 t         837.5 t
Mass, empty.............N/A           N/A
Lift-off thrust.........10,572 kN     10,572 kN
Payload to GTO..........14 t          
Payload to LEO........................22 t

First-stage
---------------------------------------------
Length..................31.02 m
Diameter................5.00 m
Mass, gross.............175.8 t
Mass, empty.............17.8 t
Mass, propellants.......158 t
Engine..................2 x YF-77
Thrust..................1,400 kN (sea-level)
Isp.....................N/A
Burn time...............N/A
Propellants.............LOX / LH2

Strap-on boosters
----------------------------------------------
Length..................26.28 m
Diameter................3.25 m
Mass, gross.............147 t
Mass, empty.............12 t
Mass, propellants.......135 t
Engine..................2 x YF-100
Thrust..................2,680 kN (sea-level)
Isp.....................N/A
Burn time...............N/A
Propellants.............Lox / Kerosene

Second-stage
----------------------------------------------
Length..................12.00 m
Diameter................5.00 m
Mass, gross.............26 t
Mass, empty.............3.1 t
Mass, propellants.......N/A
Engine..................2 x YF-75D
Thrust..................156 kN (vacuum)
Isp.....................N/A
Burn time...............N/A
Propellants.............LOX / LH2

Back to top

CZ-5 Mobile Launcher Platform, Hainan

Long March 5 ground test vehicle atop the mobile launcher platform at the Wenchang Space Centre


CZ-5 rollout

Long March 5 (Y1) in rollout to pad


cz-5-roll-out-wenchang

Long March 5 (Y1) in rollut to pad


CZ-5 launch

Long March 5 (Y1) lifts off from Wenchang


cz-5_y1_liftoff_3

Long March 5 (Y1) lifts off from Wenchang


cz-5-launch-2

Long March 5 (Y1) lifts off from Wenchang (Credit: Guo Kai)


Back to top

%d bloggers like this: